Build with Integrity
Achieve Excellence
Providing the highest quality construction services to owners and stakeholders.
Hamon Infrastructure
is a Denver-based heavy/highway general contractor constructing major road and bridge projects in Colorado and New Mexico since 1990. Hamon, a known best value provider, has a deep, institutional knowledge of the local environmental and market conditions affecting highway construction in Denver. This knowledge allows Hamon Infrastructure to minimize impacts to the traveling public while maintaining the schedule and delivering the maximum construction quality for the funds available.
Construction Projects
Cottonwood Drive Widening
14th Ave Bridge Replacement
Highline Canal Trail
DEN Concourse C – Shoring & Excavation
Brighton Boulevard – 44th to Race Street
City of Lone Tree Leaf Pedestrian Bridge
I-25 Bridges over Santa Fe & North Bound Flyover
Highland Pedestrian Bridge
Washington Ave over SH58
Federal Boulevard & 69th Bridge Replacement
US 36 Pavement Repairs Plenary Roads Project
DIA De-Icing Pond
Santa Fe Phase IV
US 6 Over Garrison Street
Delta Confluence Drive
Wadsworth By-Pass Grade Separation
Parker Road / Arapahoe Road
I-225 and Colfax Avenue Interchange – Phase 2
North I-25 Express Lanes
Speer Blvd and I-25 Bridge Rehabilitation
Plenary Roads Denver
Crystal Valley Parkway
Arapahoe Road, Waco to Himalya
Washington Street Widening
Bambei-Walker Reservoir
Willowbrook Hangers, Centennial Airport
News
Testimonials
“The Hamon team have been an invaluable asset throughout the design phase. The Hamon team worked hand and hand with Amec Foster Wheeler to provide innovative and practical ideas for the project. They truly have made this project a team approach throughout design and construction.”
“Hamon provided excellent service in meeting the needs of the Department, the City and the traveling public. Hamon
provided a high level of quality in their workmanship and the quality of the engineering required for the erection sequences was as good as I have seen.”
“I am pleased to recommend Hamon for either a low bid or best value delivery model. In our case we managed to get both.”
“Brad, I’d like to thank you and the rest of the Hamon team on the I-25 / Santa Fe project. Your ability to identify
constructibility challenges, bring creative solutions, and incorporate unexpected conditions within your work is commendable. Constructing a project of this scale and complexity amongst interstate traffic is a huge challenge, and I’m glad we have been able to partner to bring it to reality.”
“The [Wadsworth Bypass] project has been remarkable in many aspects, particularly in the fact that the driving public noticed little additional inconvenience during construction.”
“We have been most fortunate to have Hamon Infrastructure on our team for the US 6 over Garrison Street Bridge Replacement project using the Streamlined Design Build procurement method. The constructibility know-how and innovative suggestions brought forward by the Hamon Team during our Alternative Technical Concept process added value to that process and made for a better final Request for Proposals… Hamon provides a very capable team that are easily approachable, responsive and conscientious that keep our project goals foremost in their work. They understand teamwork. I highly recommend them.”
“I have been very satisfied with the professional approach and timeliness of Hamon on these projects as they were all completed on schedule and on budget.”
“Earlier this week I was able to perform the followup inspection and was quite pleased with the results. Not only had all of the issues previously discussed as potential problems been addressed, staff at site had implemented additional measures in numerous areas in direct response to our discussions at site in regards to State expectations. Granted, the staff at site may simply be “doing their job,” but the response at site to our discussions of CDPHE expectations was, in my opinion, better than what we normally see. As we have at least one other CDOT project in Denver being managed by
Hamon scheduled to start in the near future, I figured it was worth mentioning that they appear to be on track and
capable of keeping us all out of trouble. It’s just nice to have a contractor that inspires a little confidence and I wanted to take a moment to let you know our opinion.”
“The I-25/Santa Fe Project is the most complicated transportation project being constructed in Colorado today. Hamon’s solutions for traffic management and their focus on safety have facilitated minimal impacts to traffic flowing through the project.”